
By subject
Infrastructure in Azizi Riviera
Everything on this site filed under infrastructure — with the date it was announced and where we read it.

Al Asayel to 80, Al Mustaqbal to 70
The RTA raises the limit on Al Asayel Street between Oud Metha and Al Meydan Street from 60 to 80 km/h on 1 November 2026, and on Al Mustaqbal Street from Sheikh Rashid Road to Al Meydan Street from 60 to 70: the two roads most Azizi Riviera residents take to the office. Three other roads change the same day, two of them downwards.

A 500-metre bridge at the Trade Centre
The RTA opened a two-lane, 500-metre bridge serving traffic from the World Trade Centre and One Central towards Al Mustaqbal Street. The fifth and last bridge of the roundabout scheme is due in October 2026, on the route into town from Azizi Riviera.

Riviera's exit junction gets rebuilt
The junction Azizi Riviera leaves by is being rebuilt. RTA's second Al Meydan Street contract covers First Al Khail Street through Al Khail Road to Muscat Street, with a flyover interchange and cycle underpasses. Done by end-2028.